Items that make your life Better & Easier!

Training Leads for Dogs – Nylon Long Training Dog Leash Long Dog Recall Lead,Long Line for Dog Tracking Training,Long Lead Leash for Pet Recall Obedience with Comfortable Padded Handle

Add your review

$12.99

$12.99

Add to wishlistAdded to wishlistRemoved from wishlist 0
Add to compare


Price: $12.99
(as of Nov 14,2026 17:55:30 UTC – Details)


Product Description

The brand conceptThe brand concept

The brand concept of Eyeleaf

Paying for nothing but value.Eyeleaf strives to reduce the links that do not produce use value.

We really are just like you and your buddies: Obsessed with dogs. And like you, we spend as much time as possible walking the prairie, roaming the woods, or searching the sky from a waterfowl blind.

Eyeleaf dog training leashEyeleaf dog training leash

This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for medium and large dogs. You’ll love using it as a backyard dog leash, for off leash dog training, and more.Eyeleaf nylon training leash provide extra strength for controlling large dogs. This extra long training lead is designed for distance training. Handle the dogs with this sturdy leads.

1. Favourable prices.In order to save customers every penny. Eyeleaf makes a series of efforts, including customizing products only from leading factories, selling products online, avoiding huge advertisement budget.

2.Making goods of high quality rather than poor quality.It chooses fine materials and demands 100% quality check for all products.

About the Eyeleaf Brand black Check CordAbout the Eyeleaf Brand black Check Cord

FloatsFloats

Dog Training Leash

About the Eyeleaf Brand black Check Cord

A check cord is a great tool for exercising and training dogs. Lightweight and easy to coil and carry, this high-visibility, 50/65/100-foot black check cord is soft on your hands, tangle-free to prevent knots that get hung up on brush, and will float if submerged. With a heavy-duty snap, you’re in confident control during training sessions.

Tangle-free design

Easy-coil construction

Heavy-duty snap

Floats

Dog Training LeashDog Training Leash

Dog Training Leash

Dog Training Leash

Dog Training Leash

Dog Training Leash

Dog Training Leash

Dog Training Leash

Train the puppies to follow your instructions: This rope is suitable for training the puppy to focus on you, also allowing it to run agilely without getting out of your sight or control. To train it and make it follow your instructions to stop and recall.

Form memories:This rope is suitable for training your puppy to act from their memories. It trains the puppy to get used to the farthest distance from you, so when you move, memories will help it keep up to a certain distance.

By designing our products in the field, with heat, cold, rain, snow, dust, mud, and wind in mind,Eyeleaf has become the most recognized brand in the electronic tracking and training categories.

Package Dimensions‏:‎7.01 x 5.91 x 2.48 inches; 9.17 Ounces
Date First Available‏:‎May 1, 2021
Manufacturer‏:‎Eyeleaf
ASIN‏:‎B08XW4G72R

【Well made Training Leash】It’s made of strong nylon with durable metal Buckle.This long dog training leash is durable and heavy duty,easy to wear and remove
【Comfortable Design】The dog leash with a foam padded handle that is super comfortable while dogs pulling,and protects your hand
【Multi-Functional Use】Our dog training leash allows a dog to run free and teach your dog recalls and other obedience skills, yet remain under control if walking in a public place.Also great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming
【100% Service & Guarantee】:We are happy to provide full satisfaction with our Dog leash.30 days product replacement or refund if you are not satisfied. Contact us at first time if not satisfied.thank you so much

User Reviews

0.0 out of 5
★★★★★
0
★★★★★
0
★★★★★
0
★★★★★
0
★★★★★
0
Write a review

There are no reviews yet.

Be the first to review “Training Leads for Dogs – Nylon Long Training Dog Leash Long Dog Recall Lead,Long Line for Dog Tracking Training,Long Lead Leash for Pet Recall Obedience with Comfortable Padded Handle”

Your email address will not be published. Required fields are marked *

Training Leads for Dogs – Nylon Long Training Dog Leash Long Dog Recall Lead,Long Line for Dog Tracking Training,Long Lead Leash for Pet Recall Obedience with Comfortable Padded Handle

$12.99

Shopshipgift
Logo
Enable registration in settings - general
Compare items
  • Total (0)
Compare
0
Shopping cart